Navigation Membrane Codes What's New at Mule-Hide Product Information Warranty Information Warranty Eligible Contractor Login Disclaimer Sales Reps - Contact Information, Location and Territory Map Product Installation & Sales Videos National Support Product Specifications Mule-Hide Distribution About UsContact UsProducts & SystemsLinksHomeHome
Image
Products & Systems – FAQ's

EPDM
Single-Ply Systems
Frequently Asked Questions
Rule

FAQ's

  1. What is a suitable substrate for an Water Base Bonding Adhesive application?
  2. What are the Warranty Fees for EPDM Roofing Systems?
  3. How long does it take Mule-Hide to turnaround a Labor & Material Warranty?
  4. Does the contractor need to provide material invoices along with Warranty Applications?
  5. Does Mule-Hide require a total tear-off for a 10 year Labor & 
    Material Roofing System Warranty?
  6. Does Mule-Hide offer any pre-job “walk the roof” or job starts?
  7. Can I use Water Base Bonding to adhere flashings?
  8. What fasteners should be used for insulation attachment on a steel deck?
  9. What fasteners should be used for membrane attachment on a steel deck?
  10. What is Cured Cover Tape - why do I need this special tape?
  11. What is In-Seam - why do I need this special tape?
  12. What if I need to prove Mule-Hide meets the written specification for a 
    roofing system spec job?
  13. What if I need to prove Mule-Hide meets a UL or FM requirement?
  14. What if I need a submittal package?
  15. Adhesives – Types & Uses
Rule
1. What is a suitable substrate for an Water Base Bonding Adhesive application?

Plywood or OSB or 1/2" HD Fiberboard, 1/2" Dens-Deck, 1/2" Dens-Deck Prime.

Back to Top

2. What are the Warranty Fees for EPDM Roofing Systems?

Fees vary depending on the level of warranty desired. Current fees are listed on 
Mule-Hide Warranty Application forms.

Back to Top

3. How long does it take Mule-Hide to turnaround a Labor & Material Warranty?

Usually 2-3 days upon receipt of the final inspection checklist and warranty fee.

Back to Top

4. Does the contractor need to provide material invoices along with Warranty Applications?

Only Premium System Warranties must have material invoices provided.

Back to Top

5. Does Mule-Hide require a total tear-off for a 10 year Labor & 
Material Roofing System Warranty?

No, this is not required, but areas of the roof where insulation is wet must be replaced.

Back to Top

6. Does Mule-Hide offer any pre-job “walk the roof” or job starts?

Yes, Mule-Hide Field Sales Representatives offer these services.

Back to Top

7. Can I use Water Base Bonding to adhere flashings?

No, since it is applied wet it is designed for single side applications and will not hold
flashings to the wall, you need MH Bonding Adhesive (solvent base).

Back to Top

8. What fasteners should be used for insulation attachment on a steel deck?

Drill Point Fasteners should be used along with 3” Galvalume Stress Plates.

Back to Top

9. What fasteners should be used for membrane attachment on a steel deck?

Heavy Duty Fasteners should be used along with 2” Barbed Seam Plates.

Back to Top

10. What is Cured Cover Tape - why do I need this special tape?

MH Cured Cover Tape is a length of EPDM, factory-bonded to a cured butyl adhesive tape that is highly resistant to the most extreme weather & use situations. Used to strip in gravel stops and drip aprons (edges). When applied properly, it provides a long lasting, high performing seal.

Back to Top

11. What is In-Seam Tape - why do I need this special tape?

MH In-Seam Tape is a cured, butyl based, two-sided adhesive tape that bonds on contact. Used to seam and eliminate applicator inconsistencies & voids. When applied properly it provides the fastest way to achieve strong, long lasting, watertight field seams.

Back to Top

12. What if I need to prove Mule-Hide meets the written specification for a 
roofing system spec job?

Your ABC Sales Rep can facilitate by faxing 3 pieces of info to the Technical Services Administrator. Just provide ABC with the following info and a letter will be written & sent:

    1. A copy of the specification
    2. Name & address to whom the letter should be addressed
    3. Your Phone & Fax number

    Back to Top

13. What if I need to prove Mule-Hide meets a UL or FM requirement?

Your ABC Sales Rep can facilitate by providing system information to Mule-Hide. Just provide ABC with the answer to the 8 questions below and they can get a quick answer (or request a letter) from the Technical Services Administrator:

    1. What is the UL/FM requirement?
    2. Deck type?
    3. Slope?
    4. Insulation type and thickness?
    5. Membrane and system?
    6. Building location and height?
    7. Overall dimensions?
    8. Parapet height?

    Back to Top

14. What if I need a submittal package?

Your ABC Sales Rep can facilitate by providing the same info as above - plus info about penetrations, drains, tie-ins, terminations, and additional repairs to the Mule-Hide Customer Service Department, or click on the link below to request a Submittal Package on-line.

Submittals
Substitution Requests

Back to Top

15. Adhesives – Types & Uses:

Water Based Adhesive:

  • Water Base Bonding Adhesive (white acrylic) for single-side, wet, horizontal application of EPDM & flashing materials to acceptable high-density wood fiberboard, plywood, Dens-Deck, moisture resistant drywall or an acceptable OSB panel. Also available in 1 gallon pails!


  • Solvent Based Adhesives
  • Splice/Seam Adhesive (black or white) contact adhesive to adhere seams of EPDM and to adhere uncured flashing material to EPDM. TIP - avoid liquid adhesion problems - use our popular in-seam tapes and our new 6” RMS Strip with 3” Tape instead of adhesive!
  • Bonding Adhesive (yellow) to fully adhere EPDM and flashing materials to acceptable rigid insulation boards, metal, wood, masonry, & other acceptable substrates on both horizontal & vertical surfaces.
  • Single Seal Adhesive (black) is a brush or roller grade contact adhesive used as either a bonding adhesive or a splice adhesive. Used primarily on small projects where UL & FM approvals are not required. Not approved for use when requesting System Warranties.